Summit Proposal
(Gavins Point Release-Normal Conditions)
0
10,000
20,000
30,000
40,000
50,000
60,000
70,000
80,000
1/1
2/1
3/1
4/1
5/1
6/1
7/1
8/1
9/1
10/1
11/1
12/1
Text Box: Flow (CFS)
Flow (CFS)
Summit Proposal (Rise)
Summit Proposal (No Rise)
Current Operation Releases
•Provides minimum navigation flows
•Minimum flows and unbalancing of reservoirs conserves water for upper basin fisheries
•Minimum flows establishes a lower starting point for the spring rise